Project Spotlight

SFRC JOINTLESS FLOOR SLAB SUSPENDED ON PILES

CLIENT: WASTE TRANSFER STATION, POOLE

The floor slab for a Waste Transfer Station for Poole Borough Council.waste-transfer-station

THE PROJECT

Twintec designed and constructed a 1,316m2 steel fibre reinforced concrete 'jointless' internal ground floor slab suspended on piles.

OUR APPROACH

Twintec constructed a 250mm thick 'jointless' steel fibre reinforced floor slab with an ultra-hard wearing metallic dry shake floor hardener which produced an extremely wear resistant smooth and dense surface.

Request your copy

of: WASTE TRANSFER STATION, POOLE

Once you click ‘request’ below you will be redirected to page where you can save the .pdf document to your PC.

FILE SIZE: approx 238k.