Project Spotlight

Structural floor slab for new distribution centre

Lidl RDC, Newbridge

PS149-ThumbnailTwinted were selected to construct the 60,100m2 floor slab for Lidl's new distribution centre in Newbridge, Ireland.

THE PROJECT

Slab depths varied from 200mm to 300mm to suit different load requirements from the client. The construction included 2 layer slabs (separated by high-density insulation layers) for the new freezer area and also under a potential future freezer area. 

OUR APPROACH

The 60,100m2 slab was constructed over 46 pouring days over 4 phases of work to fit in with the progress of steelwork, roofing and cladding on the site.  A lot of the slab area included underfloor heating pipework, therefore Twintec worked closely with the main contractor to manage their works alongside this.

Request your copy

of: Case Study - Lidl RDC Newbridge

Once you click ‘request’ below you will be redirected to page where you can save the .pdf document to your PC.

FILE SIZE: approx 238k.

Lidl RDC, Newbridge