Close
Choose a Twintec Location
Current Location: Twintec USA USA
Select locality
Select language
Key Facts For End Users
Whatever the specific end use application - harbours with container storage, repair shops for mining or earthworks machinery or military equipment maintenance/storage - the demands on the floor slab are significant. The concrete floor slab is critical to efficient operations as it copes with the daily stresses and aggressive nature of the heavy operational traffic and environment conditions often associated with this type of operation. The last thing a facility operator needs is a floor that cannot stand up to the daily operational demands and is in constant need of repair.
Getting the floor slab right is critical to your business. Whilst it is commonly accepted that the concrete floor slab will need to be replaced within the design working life of the facility, a steel fibre reinforced concrete (SFRC) ‘jointless’ design will significantly extend this period.
Cat tracks and mobile equipment components constantly scraping across the surface will test the floor slab construction to the limit, particularly where a sawn induced joint is present. Specify a ‘jointless’ or totally seamless floor slab to provide a long term sustainable solution.
Twintec takes total responsibility – Design-Build-Guarantee.
No split responsibilities – Twintec – Design-Build-Guarantee
Floor slab designed and built to meet your needs
Significantly reduced ongoing maintenance costs
Reduced life cost
Click on the links below to request a copy of the following resources
Select your area of responsibility below for specific information tailored to your area of expertise.
Use the links below to explore
our range of products
From the earliest concept planning stage of your project, Twintec can provide consultative information to assist with preliminary design and budget planning.