"An ideal floor would be perfectly flat and have no joints"
The Twintec Ultimate floor slab has taken floor slab design and construction to a new level with no saw-cut joints and no opening construction/expansion joints, resulting in a totally seamless floor slab.
Date: Tuesday 21st November 2017
Time: 6-8pm
Venue: The Westin Hotel, Dubai Mina Seyahi Beach Resort
Speakers: Richard Groen, Managing Director Twintec Netherlands & Twintec Group R&D Director
Tom Menary, Commercial & Technical Director, Twintec Middle East
Places are limited, email today to secure your place: mail@twintecgroup.com or call 04 364 1220