Close
Choose a Twintec Location
Current Location: Twintec USA USA
Select locality
Select language
Seamless floor slab
Twintec® ULTIMATE is the latest in a long line of Twintec innovations in concrete floor slab design and achieves an end user's ultimate requirements for a totally seamless floor slab without any opening joints across the whole floor slab area.
The floor slab design combines high performance steel fibres with steel mesh and a tried and tested concrete mix design that reduces the concrete shrinkage properties of the slab to deliver the seamless finish. The use of top mesh within the slab offers significantly improved crack control allowing a maximum crack opening of 0.3mm within the floor slab to be guaranteed.
Suitable for ground bearing and slabs suspended on piles.
Use the links below to explore
our range of products
No opening construction joints or saw cuts across the floor slab, resulting in MHE operating at full capacity, no business interuption for joint repairs, and MHE driving comfort & safety.
No opening joints or saw cuts means the slab is totally seamless. No joint sealing is required. A totally seamless floor slab will reduce ongoing maintenance to MHE (tyres, wheels and control boards) as no trafficking over any joints.
Providing the ULTIMATE flexibility. Change of racking layout or building use easily achievable with the totally seamless ULTIMATE slab.
Engineered to reduce the embodied carbon via design optimisation, material selection and working methodology.
All Twintec floors are personalised to the operational requirements of the end user. The following options are also available
For for further information download the following resources.
Read about clients who are experiencing the benefits of a Twintec® ULTIMATE floor slab.
“I would like to record my thanks to all your staff who were involved in the project, from the design stage right through to completion on site. I have to say that according to reports, your site staff could not have been more helpful. Will you please pass on my personal thanks to all involved in producing a quality job well within the original time scale.”
J Mark Everett, Managing Director
J&JE Contractors Ltd