Blog | News, ideas and insights from the Twintec Group

External SFRC Hardstands

Written by Richard Booth | 27 July 2020
  • Faster construction times: Output for production can be up to 2,000m2 per day, 6 days a week, dependent on site conditions, concrete supply and weather. Additional time for steel mesh placement is eliminated, along with concrete pumping in most cases.
  • Low life cost: With the amount of joints significantly reduced, arris repairs and joint sealant maintenance costs are also reduced. This also translates to a lower maintenance cost for MHE wheel repairs.

Taking into account vehicle types, axle movements, vehicle weights and loading/offloading procedures, stock storage, the Twintec in-house design team will recommend the best design for your Freeplan XT external slab. This is then combined with skilled, experienced workers and the latest in concrete placing and finishing equipment, under the supervision of a dedicated Operations Manager to ensure the finished product meets the operational requirements.   

All materials including steel fibres, galvanised armoured expansion joints and load transfer systems are specified and provided by Twintec as part of the total package. Offering the total package Design-Build-Guarantee on both internal and external slabs, means the end user can be sure they are getting a floor slab that is specific for their operational requirements.  

Concrete is given specific attention by a dedicated in-house Concrete Specialist working with the concrete supplier to obtain the optimum mix design requirements.  No element of the design or construction is left to chance. 

Properly designed, planned and executed, Twintec Group offer the Freeplan XT product worldwide.

Contact your local business unit for further information or email us  mail@twintecgroup.com