Case Studies
Heading 1
with a request body that specifies how to map the columns of your import file to the associated CRM properties in HubSpot.... In the request JSON, define the import file details, including mapping the spreadsheet's columns to HubSpot data. Your request JSON should include the following fields:... entry for each column.
Ceva Logistis Warehouse, AUS
Warehouse
The Project
The design required superflat concrete floors capable of handling an 8-tonne post load with narrow racking.
Our Approach
Griffiths Engineers, the consulting engineers for the project, specified Twintec’s AFT®+0960HE hook-end glued steel fibres as an option to ensure superior performance and durability of the internal slabs. This innovative solution delivered exceptional
results. The AFT®+0960HE fibres, with their increased 0.9mm diameter,
provided enhanced rigidity and improved workability within
the concrete matrix.
results. The AFT®+0960HE fibres, with their increased 0.9mm diameter,
provided enhanced rigidity and improved workability within
the concrete matrix.
A state-of-the-art 47,000m² warehouse was developed for CEVA Logistics to support their ongoing growth and expansion across the
Asia-Pacific region.
Asia-Pacific region.
Request for a Copy
Once you click ‘request’ below you will be redirected to page where you can save the .pdf document to your PC.