with a request body that specifies how to map the columns of your import file to the associated CRM properties in HubSpot.... In the request JSON, define the import file details, including mapping the spreadsheet's columns to HubSpot data. Your request JSON should include the following fields:... entry for each column.
Morrisons, UK
Cold Storage
The Project
As the floor slab was cast on top of heavy duty insulation within the confines of insulated wall panels, concrete pumping was required. A tight programme required that we use two production teams working simultaneously on the project.
Our Approach
Twintec produced a 200mm thick, ground bearing jointless SFRC floor slab using a highly skilled workforce to achieve the FM2 Special flatness tolerance.
The design and construction of a 11,794m2 steel fibre reinforced concrete ground floor slab.