with a request body that specifies how to map the columns of your import file to the associated CRM properties in HubSpot.... In the request JSON, define the import file details, including mapping the spreadsheet's columns to HubSpot data. Your request JSON should include the following fields:... entry for each column.
Waste Transfer Station, Poole
Jointless floor for waste transfer station
The Project
Twintec designed and constructed a 1,316m2 steel fibre reinforced concrete 'jointless' internal ground floor slab suspended on piles.
Our Approach
Twintec constructed a 250mm thick 'jointless' steel fibre reinforced floor slab with an ultra-hard wearing metallic dry shake floor hardener which produced an extremely wear resistant smooth and dense surface.
The floor slab for a Waste Transfer Station for Poole Borough Council.