with a request body that specifies how to map the columns of your import file to the associated CRM properties in HubSpot.... In the request JSON, define the import file details, including mapping the spreadsheet's columns to HubSpot data. Your request JSON should include the following fields:... entry for each column.
Twintec ULTIMATE Deminar
Published on 8 February 2018
Twintec ULTIMATE® is the latest in a long line of Twintec innovations in concrete floor slab design and achieves an end user's ultimate requirements for a TOTALLY SEAMLESS floor slab without any opening joints across the whole floor slab area. The floor slab design combines high performance steel fibres with steel mesh and a tried and tested concrete mix design that controls the concrete to deliver a seamless finish. The use of top mesh within the slab offers significantly improved crack control allowing a maximum crack opening within the floor slab to be guaranteed. Suitable for ground bearing and slabs suspended on piles. The advantages of an ULTIMATE® floor slab are:
- Seamless/Joint Free: No opening construction joints or sawn-induced contraction joints across the floor slab resulting in higher business operational efficiencies and reduced maintenance.
- Further reduced life cost: No opening joints or saw cuts means that no joint sealing is required. A totally seamless floor slab will reduce ongoing maintenance to MHE equipment as they are not trafficking over any joints.
- Cost effective: Our design solutions can reduce the slab thickness compared to traditionally designed floor slabs.