Twintec ULTIMATE Deminar

Published on 08 February 2018

Twintec-Ultimate-in-use.jpgTwintec ULTIMATE Floor Slab

Twintec recently hosted a Deminar in The Netherlands to high end UK & European developers and contractors, showcasing the Twintec ULTIMATE(R) floor slab.

Twintec ULTIMATE® is the latest in a long line of Twintec innovations in concrete floor slab design and achieves an end user's ultimate requirements for a TOTALLY SEAMLESS floor slab without any opening joints across the whole floor slab area. The floor slab design combines high performance steel fibres with steel mesh and a tried and tested concrete mix design that controls the concrete to deliver a seamless finish. The use of top mesh within the slab offers significantly improved crack control allowing a maximum crack opening within the floor slab to be guaranteed. Suitable for ground bearing and slabs suspended on piles. The advantages of an ULTIMATE® floor slab are:

  • Seamless/Joint Free: No opening construction joints or sawn-induced contraction joints across the floor slab resulting in higher business operational efficiencies and reduced maintenance.
  • Further reduced life cost: No opening joints or saw cuts means that no joint sealing is required. A totally seamless floor slab will reduce ongoing maintenance to MHE equipment as they are not trafficking over any joints.
  • Cost effective: Our design solutions can reduce the slab thickness compared to traditionally designed floor slabs.

Contact the UK team for further advice or information on 01788 567722 mail@twintec.co.uk

 

Discover
Posted by Lesley Graham
Find me on:

Topics: Twintec Ultimate